Tracking Hazardous Chemical Waste
Generators of hazardous waste are responsible for waste generated at their site from cradle to grave, meaning that the generator is responsible for waste until it is ultimately disposed of. A manifest using EPA form 8700-22, and 8700-22A if necessary, is required every time a hazardous waste generator offers waste for transportation for off-site treatment, storage, or disposal.